DESIGN PROTOTYPEOriginal source content · Live website unchanged

Corporate Portal — Internal site for TGI Group of Companies. Built on AXERP powered by Axina.

OTC MARKETSTSPG View quote ↗CIK: 0001309056LIMITED INFORMATION
Modular compute infrastructure

Sovereign AI Compute Pods
High-Density Modular Infrastructure

Prefabricated, liquid-cooled 40-foot computing pods designed for rapid physical deployment and secure local execution. From site selection to full operational activation in under 90 days.
Concept illustration
AXINOD™ PLATFORM

<90

DAYS TO DEPLOY

1.12

TARGET PUE

300kW

COMPUTE PER POD

Tier IV

UPTIME STANDARD
Concept illustrationSovereign AI Compute Pods High-Density Modular Infrastructure
AXINOD™ 40-FOOT MODULAR LIQUID-COOLED DATA POD
300kW Compute
Liquid-Cooled
ASIC/GPU Racks
Closed-Loop Liquid
Thermal Management
PUE Target: 1.12
Stirling Heat Recovery
Waste Heat Recycling
Direct Grid Outflow
ISO Container · Off-Grid Compatible · Geofenced · Sovereignty-Locked
PLATFORM CAPABILITIES

Engineered for Sovereignty & Speed

⚡

90-Day Deployment Cycle

Prefabricated, modular ISO container designs bypass the multi-year planning and construction timelines of traditional data centers. Site selection to full operational activation in under 90 days, enabling rapid capacity scaling for sovereign partners.

🌡

Thermal Recovery Systems

AXINOD™ installations eliminate traditional air-cooling overhead, achieving a target PUE of 1.12. Closed-loop liquid cooling with Stirling heat recovery allows waste heat to be recycled for municipal heating or industrial processing — turning compute overhead into utility revenue.

🛡

Strict Sovereignty Controls

Each modular unit features localized geofencing and hardware-level isolation protocols. Sensitive government and corporate data remains within national borders, complying with strict local data residency mandates and European Court of Justice Schrems II requirements.

FLAGSHIP DEPLOYMENT

TGI AMIRON Alliance
Ekibastuz, Kazakhstan

Phase I of the Ekibastuz Data Center Valley targets a 50MW–120MW campus to Uptime Institute Tier IV standards — delivering 100% fault tolerance along the Middle Corridor trade route. Supported by a 300MW on-site Battery Energy Storage System (BESS).

✓$9.72 Billion projected NPV
✓$1.29 Billion capital infrastructure framework
✓Middle Corridor digital transit hub
✓Ekibastuz Akimat land and power access secured
14 Active Nodes
Current AXINOD™ deployments across the global network
180 PFLOPS Cumulative
Total compute capacity across active infrastructure
Zero-Carbon Thermal Energy
Off-grid power sourced from sustainable energy systems

This website contains forward-looking statements regarding infrastructure deployments and performance targets. Actual results may differ materially. Investor Disclosures · View AMIRON Alliance